SITC OF FIRE
SAFETY SYSTEMS

Supply · Installation · Testing · Commissioning

Complete turnkey SITC services for fire alarm panels, hydrant systems, sprinklers, gas suppression systems, fire extinguishers and emergency equipment — IS compliant, NBC aligned, NOC-ready. Serving Delhi, Noida, Gurugram and Ghaziabad since 2009.

IS & NBC Compliant
🏗️ 15+ Years Experience
📄 NOC Documentation Included
🔧 AMC After Commissioning
📍 Delhi · Noida · Gurugram · Ghaziabad

What Does SITC Mean in Fire Safety?

SITC stands for Supply, Installation, Testing and Commissioning — the four essential phases of deploying any fire safety system. As a single-point SITC contractor, Discreet Fire and Safety Solutions takes complete accountability from procurement of IS-certified equipment right through to a fully tested, documented and handed-over fire protection system.

Supply
Procurement of IS-marked, BIS-certified fire safety equipment directly from authorised manufacturers. All products carry valid test certificates, warranties and proper labelling before delivery to site.
Installation
Physical placement and wiring of all components as per IS standards, NBC 2016 norms and approved drawings. Our trained engineers ensure correct spacing, cabling, bracketing and earthing for every system type.
Testing
Rigorous point-by-point and integrated system testing — including loop testing, smoke/heat detector response tests, hydrant flow tests, pressure testing and panel alarm verification — with full documentation of results.
Commissioning
Formal handover with as-built drawings, test certificates, operation manuals, warranty cards and a commissioning report — all the documentation needed for fire NOC applications and insurance compliance.

Fire Systems We Supply, Install, Test & Commission

We provide end-to-end SITC for all major active and passive fire protection systems, covering equipment procurement through to tested handover and post-commissioning AMC.

Fire Alarm & Detection Systems
IS 2189 · IS 11360 · NBC 2016

Addressable and conventional fire alarm control panels (FACPs), smoke detectors, heat detectors, beam detectors, manual call points (MCPs), sounders, flashers and voice evacuation systems.

Supply of IS-marked detectors, panels & accessories from approved makes
Panel mounting, loop cabling, detector placement per NBC & IS 2189 spacing norms
Individual detector sensitivity testing; end-to-end loop verification; sounders & strobe testing
Commissioning report, FACP zone chart, as-built layout & battery backup test records
Key Deliverables at Commissioning Addressable zone map · Loop test certificate · Panel operation manual · NOC-ready test report
Fire Hydrant & Wet Riser Systems
IS 3844 · IS 5290 · NBC 2016

Internal and external fire hydrant systems including underground storage tanks (UGT), fire pumps (main & jockey), suction and delivery piping, landing valves, hose cabinets and first aid hose reels.

Supply of IS 780 / IS 5290 landing valves, IS-certified fire pumps, MS/CI piping & hose reels
UGT construction, pump room setup, piping with correct rise & fall, valve placement
Hydrostatic pressure test (1.5× working pressure), pump start test, flow & pressure at terminal
Pump test certificate, hydraulic design report, maintenance schedule & NOC documentation
Key Deliverables at Commissioning Hydraulic flow report · Pressure test certificate · Pump manufacturer warranty · As-built isometrics
Automatic Sprinkler Systems
IS 15105 · NBC 2016 · TAC Norms

Wet pipe, dry pipe and pre-action automatic sprinkler systems for offices, warehouses, high-rack storage, hotels and healthcare facilities. Includes alarm check valves, flow switches and inspector test connections.

IS 15105 compliant sprinkler heads (upright, pendant, sidewall), alarm valves & flow switches
Hydraulic layout, pipe sizing per TAC/NBC, sprinkler positioning per hazard classification
Hydrostatic test at 14 bar or 1.5× working pressure; alarm gong activation test; density test
Hydraulic calculation sheet, head schedule, test certificates & TAC/insurance documentation
Key Deliverables at Commissioning Hydraulic calculation · Head schedule · Pressure test certificate · TAC compliance report
Gas Suppression & Clean Agent Systems
NFPA 2001 · ISO 14520 · NBC 2016

FM200 (HFC-227ea), Novec 1230, CO₂ total flooding and Inergen inert gas suppression systems for server rooms, data centres, control panels, archives and UPS rooms.

UL/FM-listed cylinders, clean agent, discharge nozzles, control panels & detection heads
Room integrity assessment, cylinder bank setup, nozzle placement per design concentration
Door fan pressure test for room integrity; manual abort & abort switch test; pre-discharge alarm verification
Enclosure integrity report, design concentration certificate, hold time verification
Key Deliverables at Commissioning Room integrity test report · Cylinder weight records · Design concentration certificate · Operational SOP
Fire Extinguisher Supply & Placement
IS 2171 · IS 2878 · IS 2190

ISI-marked ABC dry powder, CO₂, foam AFFF, water-CO₂ and K-type wet chemical extinguishers. Supply in correct quantities as per IS 2190, with wall bracket installation and identification signage.

ISI-marked extinguishers with valid test records, safety pins, discharge hoses & labels
Placement per IS 2190 (max 15m travel distance), correct height, bracket fixing & signage
Pressure gauge reading log; discharge test on samples; label and date verification
Extinguisher schedule with serial numbers, installation log & next service date register
Key Deliverables at Commissioning Equipment register · Placement plan · Service schedule · IS 2190 compliance checklist
Emergency Lighting & Evacuation Systems
IS 9457 · IS 15986 · NBC 2016

LED emergency exit lights, maintained and non-maintained emergency luminaires, photoluminescent signage, assembly point markers and directional arrows for stairwells, corridors and exits.

IS 9457-compliant LED exit signs, maintained emergency lights & photoluminescent arrow signs
Placement at all exits, stairwells, corridors & refuge areas per NBC lux requirements
Battery duration test (minimum 3 hours), lux level measurement, switch-over time verification
Lux level report, battery test records, evacuation route drawing & assembly point locations
Key Deliverables at Commissioning Lux level test report · Battery endurance log · Evacuation route plan · IS 9457 compliance note

Our SITC Project Process

A structured, transparent project workflow from the first site visit to final handover — with milestone sign-offs at every stage.

01
Site Survey & Risk Assessment
Free on-site visit by a certified fire engineer. Hazard classification, area measurement, NBC & IS gap analysis, building layout review.
02
System Design & Drawing
Hydraulic calculations, detection layout, equipment schedules and AutoCAD drawings submitted for client and fire department approval.
03
Supply & Material Inspection
IS-certified equipment delivered with MTC (Material Test Certificates), ISI marks, packing lists and pre-installation inspection at site.
04
Installation
Civil, mechanical and electrical works by trained engineers. Quality checks at every stage. Client walkthrough on completion of rough-in works.
05
Testing & Inspection
Point-by-point and integrated system testing. Third-party inspection if required. All test readings documented on standard test formats.
06
Commissioning & Handover
Formal commissioning with as-built drawings, test reports, operation manuals, AMC proposal, and NOC documentation package.

SITC Documentation & Deliverables

Every SITC project handed over by Discreet Fire includes a complete documentation pack — essential for fire NOC applications, insurance, and annual audits.

Document / Deliverable Fire Alarm Panel Hydrant System Sprinkler System Gas Suppression
As-Built Drawings (AutoCAD / PDF) ✅ Zone layout ✅ Pipe isometric ✅ Head layout ✅ Nozzle layout
Material Test Certificates (MTC) ✅ Detectors & panel ✅ Valves & pipes ✅ Heads & valves ✅ Cylinders & agent
Hydrostatic / Pressure Test Report ✅ 1.5× working ✅ 14 bar / 1.5× ✅ Cylinder record
Functional / Acceptance Test Report ✅ Loop + alarm test ✅ Flow & pressure ✅ Density + alarm ✅ Hold time test
Commissioning Certificate
Operation & Maintenance Manual ✅ Panel SOP ✅ Pump SOP ✅ Valve SOP ✅ Discharge SOP
NOC Documentation Support
Warranty Certificates ✅ 1 year min ✅ Pump warranty ✅ Head warranty ✅ Cylinder warranty

Why Choose Us as Your SITC Contractor

15+ Years of SITC Experience
We have successfully commissioned fire safety systems in factories, hospitals, hotels, schools, IT parks, warehouses and residential towers across Delhi NCR since 2009.
IS & NBC Compliant Execution
All installation and testing is done strictly per BIS Indian Standards (IS 2189, IS 3844, IS 15105, IS 2190) and National Building Code 2016 — ensuring systems pass fire department inspections first time.
Single-Point Turnkey Accountability
No subcontracting headaches. We take end-to-end ownership from design and supply through to testing and handover — one team, one contract, one point of contact.
NOC-Ready Documentation
Our commissioning package is designed to meet Delhi Fire Services and UP Fire Services documentation requirements, making the fire NOC application straightforward.
Post-Commissioning AMC
We don't disappear after handover. Comprehensive Annual Maintenance Contracts covering quarterly inspections, pressure testing, refilling and re-certification of all installed systems.
Fast Mobilisation Across Delhi NCR
With offices in Paschim Vihar (Delhi) and Vasundhara (Ghaziabad), we can mobilise engineers quickly across Delhi, Noida, Gurugram and Ghaziabad — minimising project lead times.

SITC for Every Building Type

Factories & Industrial
Hydrant systems, sprinklers, suppression for high-hazard manufacturing and storage
Commercial Offices
Addressable fire alarm panels, emergency lighting and extinguisher placement
Hospitals & Healthcare
Compliant alarm systems, clean agent for ICUs, hydrant networks for large campuses
Hotels & Hospitality
Full SITC from lobby alarm systems to kitchen suppression and sprinkler networks
Schools & Institutions
Compliant alarm systems, extinguisher placement, emergency evacuation signage
Malls & Retail
Multi-zone addressable alarm panels, sprinkler networks and smoke management systems
Data Centres & Server Rooms
FM200 / Novec 1230 clean agent systems with room integrity testing and abort controls
Residential Societies
Wet riser systems, hydrant networks, basement smoke ventilation and extinguisher supply

SITC FAQs

SITC stands for Supply, Installation, Testing and Commissioning. It is a turnkey contract model where a single contractor is responsible for procuring the equipment, installing it, conducting all tests, and formally handing over a fully operational system with documentation — rather than the client managing multiple separate vendors for each phase.
The key IS standards for fire system SITC in India include IS 2189 (fire detection and alarm systems), IS 3844 (code of practice for installation and maintenance of internal fire hydrants and hose reels), IS 15105 (sprinkler systems), IS 2190 (selection, installation and maintenance of portable first-aid fire extinguishers), IS 9457 (emergency lighting) and IS 2171 (specification for portable fire extinguishers). All systems must also comply with the National Building Code 2016.
Yes. Delhi Fire Services requires that all fire protection systems be installed by a competent contractor, tested per IS standards, and a commissioning certificate / test report be submitted as part of the fire NOC application. Without proper SITC documentation, fire NOC applications are typically rejected. Discreet Fire provides all documentation required by Delhi Fire Services, UP Fire Services and GNIDA.
Timelines depend on the system type and building size. For a small to medium commercial premise (up to 5,000 sq.ft), installation and testing of a fire alarm system takes approximately 3–7 working days. A fire hydrant system for a similar-sized building takes 1–3 weeks. Gas suppression systems for a single server room typically take 3–5 days. Large industrial or multi-storey projects can take 4–12 weeks. We provide a detailed project schedule before commencing any work.
Yes. Discreet Fire and Safety Solutions provides full SITC services across all of Delhi NCR including Noida (all sectors), Greater Noida, Gurugram (including Manesar and Sohna Road) and Ghaziabad (including Vasundhara, Indirapuram and Raj Nagar Extension). We handle UP Fire Services and GNIDA fire NOC documentation for projects in Noida and Ghaziabad.
Yes. We offer comprehensive Annual Maintenance Contracts (AMC) for all systems we install. Our AMC covers quarterly scheduled inspections, pressure testing, battery replacement, detector cleaning, refilling of extinguishers, and annual re-certification — keeping your systems compliant and ready at all times. AMC pricing is included in our commissioning handover proposal.
Ready to Start Your SITC Project?
Free site survey · IS & NBC compliant execution · NOC-ready documentation · Delhi NCR